Posts Tagged buildout

Buildout at 25 Dundurn St. North!

We have a new space, colocated with the Staircase Theatre on Dundurn Street. It’s a super sweet second floor, with tons of natural light (daystar!). The best thing about the new space is that it’s approximately the most accessible location in the city – Dundurn and King. We’ve got a floor plan worked out, with a chem / cnc room, workshop space, and loungey space.

Buildout week starts today! At the open|haus tonight, we’ll be moving the 175 2x4s we ripped out of the old space over to the new one. We’ll talk about how things will work during buildout week and how you can lend a hand. We’ll keep this page updated for folks who can’t make it out tonight.

,

No Comments