The mill is moving!

DSCN8010DSCN8017

The gearbox is fixed. The mill motor can be wired up and works. The collet was removed and opened. As well, a source of more collets was found and we may be able to get a whole set. All that is needed now is a box to put the motor capacitor in and a vice to clamp to the ways.

The kiln is very nearly done!

DSCN8018DSCN8019

The wiring is done shy of the two heating elements that will be purchased from The Pottery Supply House and a sheet metal plate to cover the back. Now, moving forward a shed will need to be built and discussions with insurance will be needed, but it is very nearly done.

As for the stilts, the clips have not come. They were supposed to arrive by Friday…. And that was the second time I ordered them…. Anyways, they will sit/stand waiting.

 